Utility Survey Case Study

Semi-rural Road Scheme

This road survey was commissied to locate utlities within the footprint of a new pipeline. A detailed close-centred survey of the whole area was required so a Level 6 survey was carried out throughout.

Below is a low resolution plot of the results of the survey. High resolution plots of this and other aspects of the survey can be downloaded by clicking on the relevant text below

Site location and survey area 

Record drawings

Electromagnetic locator survey

Manhole survey log 

GPR interpretation

Final interpretation

Low Resolution Plot of Final Interpretation Semi-rural road scheme - final interpretation